
PT Bayung Agro Sawita
– Replacement Of Fibre Cyclone
– Replacement Of Destoner
– Replacement Of Cyclone (LTDS 1 & 2)
– Replacement Of Cyclone For Fat Pit (180 m³)
– Replacement Of Thresher Drum
PT Palma Jaya Sejahtera
– EFB Empty Bunch Press Works
PT Citra Sawit Indah Lestari
– Kernel Elevator & Conveyor System Works Up To The Kernel Bunker
– Kernel Bunker Works
PT Harkat Sejahtera
– Modification Works of Vertical Sterilizer from Non-Auger To Auger Type
– Screw Conveyor 800 CBC Works
PT Paramita Bangun Sarana
– Steel Fabrication Works For EcoOils Building, Sei Mangkei
– Sandblasting And Painting Works For Steel Structure Of EcoOils Building, Sei Mangkei
PT Agrojaya Perdana
– Screw Press
– Digester Work
PT Beurata Subur Persada
– Fabrication And Installation Works Of Thermal Deaerator Tank, Diameter 3000 mm
PT Agronusa Prima Sawita
– Preparation Of Drawings, Cost Budget Plan (RAB), And Electrical Bill Of Quantities (BQ) For PKS APS
PT. Srigunung Inti Agro Persada
– Electrical Work On Palm Oil Mill Construction Cap 50-60 Ton FFB/HR

PT Niaga Guna Kencana Sawit
– Technical Planning and Consultancy Work for the Working Drawings of a Palm Oil Mill (PKS) with Capacity Expansion from 45 Tons TBS/Hour to 90 Tons TBS/Hour
PT Srigunung Inti Agro Persada
– Debarker–Chipping Plant, Energy Plant, And Internal System Grounding
– Design Drawings For Palm Oil Mill (PKS) Construction With A Capacity Of 45 Tons
PT Indonesia Fibreboard Industry Tbk
– Internal Grounding System Works
– Control Cable Works For Debarker–Chipping Plant And Energy Plant

PT Indonesia Fibreboard Industri Tbk entrusted PT Sukses Akurasi Makmur with the Electrical Works for Line 2 of the MDF Provision Project, supporting the Pre-Commissioning Electrical activities in Palembang.
PT Agrojaya Perdana entrusted PT Sukses Akurasi Makmur with the Vertical Sterilizer Supply Project for the Pre-Commissioning Vertical Sterilizer works in Jambi.
PT Sukses Akurasi Makmur was entrusted by PT Indonesia Fibreboard Industry Tbk to fabricate and install the Bag Filters and Ducting for Sanding Line 3 in Palembang, completing the work from Initial Testing through Load Testing smoothly.
PT China State Construction Engineering entrusted our team with the equipment installation works for the Refinery, Fractionation, and Hydrogenation Plants of Sime Darby at KEK Sei Mangkei, supporting the execution and commissioning phases of the industrial development project at KEK Sei Mangkei.